Trail Overview
Location: Quakertown, PA
Know Before You Go:
Lots of smooth flowing singletrack with minimal elevation. The trails here stay wet for longer periods after rainfall, so please give them extra time to dry. The trails also close for extended periods between Thanksgiving and Easter.
Difficulty: 2/5
Number of Miles: 10
Total Vertical: Minimal elevation gain, but the trails are constantly rolling
E-Bikes: Class 1 E-bikes with 750-watt max power.
Night Riding: A no-night riding policy is enforced by the park.
Recommended Trailhead:
The Tower Road Lot has direct access to the trail system and includes a port-a-pot and pavilion (currently under construction.)
Alternatively, the Haycock Boat Launch has a paved lot with improved restrooms. It’s about .5 miles to the trails.
Trail Details
The trails around the eastern shores of Lake Nockamixon are some of the most popular in Pennsylvania. The system includes about 8 miles of handbuilt singletrack organized into three primary loops. Most riders ride Nox as a continuous counterclockwise loop, but most trails can be ridden in either direction (Upper Haycock Run is the only exception) so riders can mix up the trail segments to create longer or shorter loops.
Most of the trails are flowing smooth dirt with few natural obstacles and there are plenty of fun side features along the way. The most challenging trails are at the southernmost end within the Jaywalk loop, where there’s a little more elevation, some steeper pitches, and a few more rocks.
While the trails have few substantial climbs, the terrain is not flat; it rises and falls along gullies, shallow hills and around inlets and coves. Overall, you’ll experience twisty, rocky, smooth, rolly polly trails through open woods, thick cedars and big pines. It’s a kaleidoscope of enchanting terrain and possibly inhabited by Gnomes.
VMB is currently working with the state park to build a pavilion at the Tower Road Parking area. The mountain bike community has contributed more than $21k toward the cost, with VMB covering the rest. We expect the pavilion to be completed this summer but there is still time to donate. https://www.gofundme.com/f/nox-tower-lot-pavilion















