Trex current work

I was consulted by an experience park builder who recommended we communicate what is being done to reduce objection. The current trail build is reworking a poorly designed trail and destroyed by me in the early days of killdozer, it was lost to the Autumn Olive this past season. The area was fully cleared to about 80' then Chris Tallotta laid out a sweet flowing trail which soaked up the full corridor. The dozer was used to remove the upper layer of Autumn Olive loam to remove AO roots and expose the underlying shale. Under the direction of the land manager whom inspected the site we seeded with 50lbs of red clover and covered the disturbed earth with about 15 bales of straw via bale chopper. Rough grading and shaping was done with the Dingo with 42" 6-way blade. It is rough but ready to be test ridden for adjustment, fine tuning, and buffing.

Construction is not complete so please bear with the site.