Jonk and I worked at Trexler Sunday afternoon for about 3hours.
He cleaned up the intersection at the top of the first half pipe. He also bench cut and raked the first 75 to 100 yards of halfpipe. I raked and bench cut about a 100 yards after the second halfpipe going away from the stable (the sloped area above the Winchester parking area). The ground is still mostly frozen but once you get through the first inch or two it's workable. On the sloped area I hit small pieces of shale about 3 to 5 inches down. With it staying light out until almost 6PM I'm going to take the boys up after school for a few hours a few times a week. I'll post events once we have a schedule.