They like the new trail-SME

Dig some work today at SME. The section between where we stopped doing rock work and the big climbing rocks is flagged and some of the benchcutting has been started.If you want to work on your own ,there would be plenty to do on this section. Use the excess soil to fill between the rocks where we did the rockwork.

Strauss, the are a few downed trees to cut through towards the top.Anytime you feel like it, go for it!

Its amazing at how much water is flowing on that mountain! Some of the lower trails are a mess and could use a reroute.

It was interesting today-riders were actually hacking down to the new trail to get back down to the bottom to not deal with the mega slop to the right( as you head in from
alpine).