Salisbury Trailwork Hours
Name | Description | |||
---|---|---|---|---|
jerry h |
03/05/2016 |
Remove downed trees, repair erosion damage and intall erosion control measures. |
6.00 |
|
jerry h |
03/06/2016 |
repair stream crossings |
1.00 |
|
Mazzman |
03/05/2016 |
Trail repair |
4.00 |
|
dunlap837 |
03/05/2016 |
Remove downed trees, repair erosion damage, install erosion control measures |
6.00 |
|
HecklerMike |
03/05/2016 |
Groomed trails were water damage was prevalent. |
3.00 |
|
dunlap837 |
03/20/2016 |
Repair erosion damage and install new erosion control measures |
3.00 |
|
jerry h |
03/20/2016 |
Repair erosion damage and install erosion control measures |
4.00 |
|
el Presidente |
03/20/2016 |
repair tired trail |
4.00 |
|
el Presidente |
03/05/2016 |
regrade |
4.00 |
|
Mazzman |
04/03/2016 |
Helped Jerry remove deadfall |
1.00 |
|
HecklerMike |
04/23/2016 |
Assisted with Rock Armoring part of Notcho, Assisted with moving downed tree from Blue . |
3.00 |
|
jerry h |
03/26/2016 |
Repair erosion damage and install erosion control measures |
3.00 |
|
jerry h |
04/23/2016 |
Rock armor stream crossing on Nacho |
4.00 |
|
Mazzman |
05/01/2016 |
Blue reroute |
3.00 |
|
jerry h |
05/01/2016 |
reroute blue away from wet area |
3.00 |
|
Mazzman |
05/08/2016 |
Multiflora rose removal |
3.00 |
|
jerry h |
05/08/2016 |
Corridor clearing on blue by power lines. |
3.00 |
|
jerry h |
05/14/2016 |
Rework blue trail by power line above Boulder trail. |
5.00 |
|
Mazzman |
05/30/2016 |
Corridor Clearing |
2.00 |
|
jerry h |
06/04/2016 |
corridor clearing |
2.00 |
|
jerry h |
06/05/2016 |
corridor clearing |
3.50 |
|
jerry h |
07/30/2016 |
clear storm damage |
4.00 |
|
HecklerMike |
07/30/2016 |
removed fallen trees on Red and Orange |
1.50 |
|
dunlap837 |
07/30/2016 |
Corridor Clearing |
3.00 |