Salisbury Trailwork Hours

Name Description
jerry h
03/05/2016
Remove downed trees, repair erosion damage and intall erosion control measures.
6.00
jerry h
03/06/2016
repair stream crossings
1.00
Mazzman
03/05/2016
Trail repair
4.00
dunlap837
03/05/2016
Remove downed trees, repair erosion damage, install erosion control measures
6.00
HecklerMike
03/05/2016
Groomed trails were water damage was prevalent.
3.00
dunlap837
03/20/2016
Repair erosion damage and install new erosion control measures
3.00
jerry h
03/20/2016
Repair erosion damage and install erosion control measures
4.00
el Presidente
03/20/2016
repair tired trail
4.00
el Presidente
03/05/2016
regrade
4.00
Mazzman
04/03/2016
Helped Jerry remove deadfall
1.00
HecklerMike
04/23/2016
Assisted with Rock Armoring part of Notcho, Assisted with moving downed tree from Blue .
3.00
jerry h
03/26/2016
Repair erosion damage and install erosion control measures
3.00
jerry h
04/23/2016
Rock armor stream crossing on Nacho
4.00
Mazzman
05/01/2016
Blue reroute
3.00
jerry h
05/01/2016
reroute blue away from wet area
3.00
Mazzman
05/08/2016
Multiflora rose removal
3.00
jerry h
05/08/2016
Corridor clearing on blue by power lines.
3.00
jerry h
05/14/2016
Rework blue trail by power line above Boulder trail.
5.00
Mazzman
05/30/2016
Corridor Clearing
2.00
jerry h
06/04/2016
corridor clearing
2.00
jerry h
06/05/2016
corridor clearing
3.50
jerry h
07/30/2016
clear storm damage
4.00
HecklerMike
07/30/2016
removed fallen trees on Red and Orange
1.50
dunlap837
07/30/2016
Corridor Clearing
3.00